Project Planner (Primavera P6 Required) job at Bowie Instrumentation and Electrical Zambia Limited
419 Days Ago
Linkedid Twitter Share on facebook
Project Planner (Primavera P6 Required)
2025-09-08T16:05:21+00:00
Bowie Instrumentation and Electrical Zambia Limited
https://cdn.greatzambiajobs.com/jsjobsdata/data/employer/comp_9409/logo/download%20(7).jpeg
FULL_TIME
Zambia
Lusaka
10101
Zambia
Professional Services
Management
ZMW
MONTH
2025-09-16T17:00:00+00:00
Zambia
8

The Project Planner is responsible for developing, maintaining, and monitoring project schedules using Primavera P6, ensuring alignment with project execution strategy, milestones, and client requirements. The Planner works closely with construction, procurement, engineering, and quality teams to track progress, identify delays, and implement recovery strategies.

Key Responsibilities:

Develop and maintain the Level 1–4 project schedules using Primavera P6
Integrate procurement, engineering, construction, commissioning, and client milestone data into one cohesive master schedule
Conduct critical path analysis and float monitoring
Perform progress measurement and update schedules with actual data (physical % complete, manhours, etc.)
Identify potential delays or resource constraints and propose mitigation or recovery plans
Interface with site supervisors, subcontractors, and other disciplines for accurate inputs
Generate weekly and monthly reports including S-curves, earned value analysis, look-ahead plans, and variance analysis
Monitor productivity, track key performance indicators, and update forecast models
Assist in claims preparation and time impact analysis, if required
Ensure the planning and scheduling practices comply with project procedures and client standards

Minimum Qualifications & Requirements:

Education:

Degree or National Diploma in Engineering, Construction Management, or Project Management
Planning or scheduling certification (e.g. PMI-SP, AACE, or Primavera training) is an advantage
Experience:

5+ years of experience as a planner/scheduler in major infrastructure, mining, or industrial projects
Minimum 3 years of hands-on experience with Primavera P6 in a project environment
Previous experience on E&I, mechanical, or multi-discipline projects is essential
Familiarity with project controls concepts such as Earned Value Management (EVM) and resource loading

Skills & Competencies:

Proficient in Primavera P6 and MS Project
Advanced Excel skills (pivot tables, formulas, dashboards)
Strong analytical and reporting abilities
Excellent communication and coordination skills
Detail-oriented and highly organised
Ability to work under pressure and meet tight deadlines

Working Conditions:

Project site-based role (remote mining area)
May involve extended hours, rotation shifts, or overtime as required
Must comply with all health and safety requirements and PPE regulations on site

bachelor degree
60
JOB-68befec1b1969

Vacancy title:
Project Planner (Primavera P6 Required)

[Type: FULL_TIME, Industry: Professional Services, Category: Management]

Jobs at:
Bowie Instrumentation and Electrical Zambia Limited

Deadline of this Job:
Tuesday, September 16 2025

Duty Station:
Zambia | Lusaka | Zambia

Summary
Date Posted: Monday, September 8 2025, Base Salary: Not Disclosed

Similar Jobs in Zambia
Learn more about Bowie Instrumentation and Electrical Zambia Limited
Bowie Instrumentation and Electrical Zambia Limited jobs in Zambia

JOB DETAILS:

The Project Planner is responsible for developing, maintaining, and monitoring project schedules using Primavera P6, ensuring alignment with project execution strategy, milestones, and client requirements. The Planner works closely with construction, procurement, engineering, and quality teams to track progress, identify delays, and implement recovery strategies.

Key Responsibilities:

Develop and maintain the Level 1–4 project schedules using Primavera P6
Integrate procurement, engineering, construction, commissioning, and client milestone data into one cohesive master schedule
Conduct critical path analysis and float monitoring
Perform progress measurement and update schedules with actual data (physical % complete, manhours, etc.)
Identify potential delays or resource constraints and propose mitigation or recovery plans
Interface with site supervisors, subcontractors, and other disciplines for accurate inputs
Generate weekly and monthly reports including S-curves, earned value analysis, look-ahead plans, and variance analysis
Monitor productivity, track key performance indicators, and update forecast models
Assist in claims preparation and time impact analysis, if required
Ensure the planning and scheduling practices comply with project procedures and client standards

Minimum Qualifications & Requirements:

Education:

Degree or National Diploma in Engineering, Construction Management, or Project Management
Planning or scheduling certification (e.g. PMI-SP, AACE, or Primavera training) is an advantage
Experience:

5+ years of experience as a planner/scheduler in major infrastructure, mining, or industrial projects
Minimum 3 years of hands-on experience with Primavera P6 in a project environment
Previous experience on E&I, mechanical, or multi-discipline projects is essential
Familiarity with project controls concepts such as Earned Value Management (EVM) and resource loading

Skills & Competencies:

Proficient in Primavera P6 and MS Project
Advanced Excel skills (pivot tables, formulas, dashboards)
Strong analytical and reporting abilities
Excellent communication and coordination skills
Detail-oriented and highly organised
Ability to work under pressure and meet tight deadlines

Working Conditions:

Project site-based role (remote mining area)
May involve extended hours, rotation shifts, or overtime as required
Must comply with all health and safety requirements and PPE regulations on site

Work Hours: 8

Experience in Months: 60

Level of Education: bachelor degree

Job application procedure
Interested in applying for this job? Click here to submit your application now.

All Jobs | QUICK ALERT SUBSCRIPTION

Job Info
Job Category: Administrative jobs in Zambia
Job Type: Full-time
Deadline of this Job: Tuesday, September 16 2025
Duty Station: Zambia | Lusaka | Zambia
Posted: 08-09-2025
No of Jobs: 1
Start Publishing: 08-09-2025
Stop Publishing (Put date of 2030): 08-09-2077
Apply Now
Notification Board

Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.

Caution: Never Pay Money in a Recruitment Process.

Some smart scams can trick you into paying for Psychometric Tests.