Keepers Zambia Foundation in partnership with People in Need Zambia (PIN) and the lead partners, CELIM, are implementing the project, Integrated Action for Mitigating the Effects of Climate Change on the Most Vulnerable Communities in Zambia (AIM Zambia). The project is funded by the Italian Ministry of Foreign Affairs and International Cooperation (MAECI) through AICS. Project targets are in 7 districts (Sikongo, Shangombo, Namwala, Kalomo, Chibombo, Mumbwa and Lusaka). However, KZF is implementing 3 districts, Sikongo, Shangombo, Namwala, Kalomo.
The project has 3 result areas, Food and Nutrition, WASH, and Protection. KZF is implementing WASH in Sikongo, Shangombo, Namwala, Kalomo.
As part of its WASH interventions, the project will rehabilitate handpumps in selected communities and institutions withing the project target areas.
The proposed intervention is a general complete overhaul rehabilitation of six (6) handpumps in selected project areas:
3.1 Southern Province – Two in Namwala (i.e. Hitusenke & Nyumba yanfumu community boreholes in Mandondo ward) and one in Kalomo (at Mwili School in Mikata ward) districts.
3.2 Western Province – Two in Sikongo (i.e. Mabua School and Sikushi School boreholes) and one in Shangombo (at Makalati Primary school)
The Bidder is required to submit the following:
1. Propose works and financial offer
2. Valid NCC category B or C
3. Valid ZPPA Certificate
4. Valid PACRA Registration
5. Valid TPIN
6. Workers’ Compensation
7. Company Profile with physical address
8. Valid EIZ registration License
9. Valid Tax Clearance certificate
10. Provision of brief method statement
11. Provision of 3 Months latest bank statements
12. Duration of project & Gant chat showing schedule of works
13. Proof of experience in similar works (Certifications of completion, award letters, Purchase orders etc.).
1. Registered EIZ Water engineer, civil engineer,
2. hydrogeologist, hydrologist or related qualifications with diploma or degree added
advantage with at least 2 years’ experience for supervision of work.
3. Plumber with at least 3 years’ experience
4. Own and reliable equipment
The Bidder is encouraged to visit and examine the site and its surroundings and obtain for itself all information that may be necessary for preparing the bid. The costs of visiting the site shall be at the Bidder’s own expense, risk and responsibility.
Successful bidders shall be notified, and the contract agreement shall be sent for review and signing.
The Client expects the project to be completed within 30 days of the date of signing the contract.
All BIDs must be sealed, clearly marked “LOT 1” and deposited no later than the 18th of March 2026 by 13:00hrs, addressed to
The Chairperson, Procurement Committee.
Keepers Zambia Foundation Office Plot number 55,
Luwato Road, Roma, Lusaka
The submission should also include a USB Flush Drive containing soft copies of all documents
For detailed scope of works, BOQs, drawings of each site, and any other information or clarification, send your email to kingfred.simwinga@keeperszambia.org or call +260779689988.
Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.