Expression to conduct a feasibility study into setting up a synthetic gypsum plant at ZCCM Investments Holdings Plc

TERMS OF REFERENCE: Expression to conduct a feasibility study into setting up a synthetic gypsum plant at ZCCM Investments Holdings Plc

1.0 BACKGROUND ZCCM Investments Holdings Plc (ZCCM-IH) intends to pursue the manufacturing of synthetic gypsum as part of its commodity diversification and value addition strategy. As such, the Feasibility Study (FS) of setting up the proposed Synthetic Gypsum Manufacturing Plant within Zambia. The proposed Synthetic Gypsum Manufacturing Plant should be able to make use of the key inputs limestone and sulphuric acid) that are readily available from the local sourcesin its operations.

it is envisaged that the proposed synthetic gypsum plant should be able to satisfy the demands of local cement companies and to supply to other industries for the manufacture of glass, plaster, drywall and fertilizers among others.

2.0 PROJECT SCOPE OF WORK

The Consulting Firm shall be required to conduct the following works:

samples of sulphuric acid and limestone from local sources. The test should be a full analytical test using appropriate analytical procedures b) Metallurgical tests to produce commercial grades of gypsum (premium 89.7% Caso, 2H,O, grade 1 - 80.5% Caso, 2H,O, grade 2 - 67.1% Caso 2H, and grade 3 - 53.7% COSO.2H0) for the development of the Basic Design/Conceptual Flow Sheet. c) Review life of mine (LOM) data from limestone operating mines. d) Use the average requirements of the main customers cement plants and other industry requirements, for sizing the synthetic gypsum plant (the Base Case), and e) Review, with input from ZCCM-H, the provision for upgrading the size o plant to provide extra capacity above the base case should the need arise. (This may be necessitated by a need to supply other cement producer outside Ndola (such as the cement plants based in the Lusaka area) production of other secondary gypsum-based products, such as construction materials, Plaster of Paris etc.)

3. TASKS.

 To successfully carry out this assignment, the following tasks are expected to be undertaken by the successful bidder.

a) Mobilization.

The Consultant shall be required to mobilize for the assignment as soon as the Contract is signed off with the client. This shall include advising the Client of which personnel are assigned to the Project.

b) Data Collection and Review.  

The Consultant shall be provided with the pertinent technical data available for review and comment by the Client.

c) Receipt of Sulphuric acid Samples

The Consultant shall be provided with the sulphuric acid samples from the local sources (Due to its hazardous nature, shipping of an actual sample to the Consultant's site may be impractical. A Certificate of Analysis may be provided to the Consultant instead who can then use an equivalent quality of acid in the tests)

d) Receipt of Limestone Samples

The Consultant shall be provided with the limestone samples by the Client

e) Testing

The Consultant shall carry out the tests as indicated in section 4 above, and any other tests as agreed between the Consultant and Client and

f) Reports

The Consultant shall be required to provide regular updates on milestones achieved throughout the project duration, according to a signed off Month by Month schedule of project activities, which will also give the total duration of the Study. On completion of the program, the Consultant shal be expected to produce detailed reports covering the widerscope of works provided.

4. DATA CONFIDENTIALITY

 The Consultant is expected to maintain highest levels of confidentiality throughout the process and treat with utmost confidentiality, al sources of information

Accordingly, the Consultant is prohibited from sharing any project information intentionally or otherwise with any external party without express authority of the Client.

5. PROJECT DELIVERABLES

On successful signing of contract with the Client, the Consultant shall be required to prepare and submit the following list of deliverables:

a. Inception Report -The report shall be submitted to the Client within a week of signing the contract. The report should clearly state the Consultant's understanding of the scope of work and present their mobilisation plan. Wherever necessary and with valid justification, the report should provide alternative approach to the scope of work.

b. Progress Reports - the Consultant shall submit Monthly Reports according to the agreed Month by Month schedule of activities. Submission and review of these reports will be the basis for making progressive payments to the Consultant Final Report -Two hard copies of the Final report printed in colour shall be submitted to the Client by the last working day of the final month of the schedule agreed between the Consultant and Client, in addition to information presented in the Progress Reports, the final report shall include conclusions and recommendations and d. Digital Copy - In addition to hard copies, the Consultant bidder shall also submit to the client a soft copy of the final report. e. A virtual/physical presentation to the ZCCM-IH Management 1. The Consultant can finish the project earlier than the maximum stated project duration 6. CONSULTANCY FIRM'S

Similar Jobs in Zambia

Learn more about ZCCM Investments Holdings Plc

ZCCM Investments Holdings Plc jobs in Zambia

QUALIFICATIONS AND EXPERIENCE

The consultant should have: a. The Consultant should be reputable, with relevant experience in mineral processing test work and development of Basic Engineering Designs/Conceptual Flow Sheets. Being an EPCM Contractor is preferable, but if Consultant is not an EPCM Contractor, they should demonstrate a relationship with EPCM Contractors and give a list of such EPCM Contractors, who can convert the Conceptual Flow Sheet (Basic Engineering Design), into a Detailed Engineering Design that is suitable for construction C. The Consultant shall be required to demonstrate successful undertaking of similar assignments in the last 10 years with traceable former Clients.

7. KEY STAFF QUALIFICATIONS

The Consultant firm shall be required to demonstrate that all personnel to be assigned on the project have the required experience and competence to undertake the assignment. As such, the team should be multidisciplinary covering such skills considered as key to the successful completion of the assignment, and include, as a minimum. c member qualified in mineral process engineering and alied disciplines.

a. Lead Consultant

The Lead Consultant should possess relevant qualifications in mineral process engineering, metallurgy, chemical engineering or other allied disciplines and have not less than 10 years of experience in similar undertakings with a good Success record.

Submission Procedure

Further, the Consultant should provide a description of the key staff to work on the project together with their detailed Curriculum Vitae (CVS) and contact addresses. The CVs must also be signed off byrespective staff.

b. Other Experts The other experts may also be qualified in the same disciplines as those indicated above for the Lead Consultant, with at least 5 years' experience in similar projects. They may be complemented, if necessary, by experts qualified in any of the following disciplines, and with a minimum of 5 years' experience in similar projects:

1 Mechanical Engineering il Electrical Engineering ill. Control & Instrumentation iv. Civil Engineering V. Structural Engineer vi. Environmental Engineering

8. SCHEDULE OF ACTIVITIES

The Consultant bidder shall be required to strictly abide by the timeframe provided. To avoid unnecessary time delays and waste, the Consultant is expected to hold regular updates/briefings/ with and bring to the client's attention any problems/challenges encountered during the process.

if time extension is necessary, such as due to delayed acquisition of inputs into the project, such as samples, reports etc, the Consultant must request for such extension, in writing. The Client will write back to the Consultant indicating the extension period for anyjustifiable delays.

9. DECLARATION OF AUTHENTICITY OF REPORTS

 The Consultantshal make a full declarction of the authenticity of information to be submitted in all reports.

a. Lead Consultant The Lead Consultant should possess relevant qualifications in mineral process engineering, metallurgy, chemical engineering or other allied disciplines and have not less than 10 years of experience in similar undertakings with a good Success record.

Further, the Consultant should provide a description of the key staff to work on the project together with their detailed Curriculum Vitae (CVS) and contact addresses. The CVs must also be signed off byrespective staff.

b. Other Experts The other experts may also be qualified in the same disciplines as those indicated above for the Lead Consultant, with at least 5 years' experience in similar projects. They may be complemented, if necessary, by experts qualified in any of the following disciplines, and with a minimum of 5 years' experience in similar projects:

1 Mechanical Engineering il Electrical Engineering ill. Control & Instrumentation iv. Civil Engineering V. Structural Engineer vi. Environmental Engineering

8. SCHEDULE OF ACTIVITIES

The Consultant bidder shall be required to strictly abide by the timeframe provided. To avoid unnecessary time delays and waste, the Consultant is expected to hold regular updates/briefings/ with and bring to the client's attention any problems/challenges encountered during the process.

if time extension is necessary, such as due to delayed acquisition of inputs into the project, such as samples, reports etc, the Consultant must request for such extension, in writing. The Client will write back to the Consultant indicating the extension period for anyjustifiable delays.

9. DECLARATION OF AUTHENTICITY OF REPORTS

The Consultantshal make a full declarction of the authenticity of information to be submitted in all reports.

The Consultant shall:

Provide own office, transport, accommodation and other necessary logistical items to effectively execute the works.

I.             Provide computers, printers and other information Technology (IT) equipment necessary to record, analyze and present the reports in required formats.

II.            Design methods appropriate for gathering of data specific to theassignment within the framework of the scope provided.

III.           Provide stationery and other related materials for producing reports for the assignment

IV.          Ensure that quality of work is maintained at all stages of the assignment.

V.            vi. Ensure security of data at all times and . Maintain confidentiality of information obtained due to the business relationship

Job Info
Job Category: Tenders in Zambia
Job Type: Full-time
Deadline of this Job: 1 July 2022
Duty Station: Lusaka
Posted: 17-06-2022
No of Jobs: 1
Start Publishing: 17-06-2022
Stop Publishing (Put date of 2030): 17-06-2066
Apply Now
Notification Board

Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.

Caution: Never Pay Money in a Recruitment Process.

Some smart scams can trick you into paying for Psychometric Tests.